Saturday 26 October 2013

Week 12


The final internal timber lintel went in. Another beautiful piece of ironbark.


The posts to carry the t bar lintel above the bay door was installed. The t bar will be welded on top to carry the load of bricks above.


Brickies at work on the footings, not their best work mind you. This wall is technically called a "pig". Due to it's long length an error was made in the levels which meant the wall was going downhill. Luckily this wall will be hidden under the house as it is support for floor trusses, otherwise it would have meant pulling it down and starting again. No effect on structural integrity, just not pretty to look at.


The start of digging up the grass for our garden.